Our Projects DGPS and Others
Project Name Date Started Date Finished
Add. Transmission System of Lamma Island 275kV Cable Route from   Jul 2004 Jun 2005
Description
project Scope:

1) Construction of landing points at Yung Shue Wan South, Pak Kok Tsui, Pak Kok San Tsuen and Cyberport including all excavation, installation of silt curtain, temporary supporting, drainage provisions, back filling, RC cable joint bay construction, dredging, marine works, seawall construction, rock fill, cable slop way , slope formation, submarine cable markers and reinstating works.
2) Design and construction, instrumentation and completion of the horse-shoe shaped cable tunnels of approximately 220m in length having an internal clear nominal diameter of 2.5m through the existing hillside north of the power station to Yung Shue Wan South Landing Point.
3) Design and construction, instrumentation and completion of the horse-shoe shape cable tunnels of approximately 130m in length having an internal clear nominal diameter of 2.5m through the existing hillside from Pak Kok San Tsuen to Pak Kok Tsui.
Project View